CIRCL: the cheapest building is rarely the cheapest building

A modular builder that costs more per square metre and asks the customer to compare something else: the total cost of the building over thirty years. What CIRCL shows about selling against the tender's own unit of measure.

A modular builder that costs more per square metre and asks the customer to compare something else: the total cost of the building over thirty years. What CIRCL shows about selling against the tender’s own unit of measure.

Every buyer of a building knows one number by heart: the price per square metre. It is printed on the tender, it is easy to compare, and it decides more contracts than any other figure in construction. CIRCL, the modular housing company of the Vanhout group, sells against it. Its homes are built in a factory from timber frames and bio-based insulation, arrive on site as finished modules, and are assembled in weeks rather than months, with a fixed price and a fixed delivery date. Per square metre, that often costs more than a traditional contractor. So CIRCL asks its customers to compare something else.

The comparison CIRCL is asking for

In its own words, the argument runs like this. A building that looks cheaper but takes longer, needs more project management, or produces more surprises along the way can end up considerably more expensive. For an investor the horizon is longer still: how easily can the building be adapted later, how sustainable is the portfolio it sits in, and what quality is still standing in twenty or thirty years? Financing, construction time, internal hours, risk, adaptability, sustainability, quality. The €/m² figure is part of the cost. It is not the cost.

Read against the research, that list is the five dimensions of Systemic Value, spoken by a supplier rather than a researcher. Fixed price and fixed date move financial risk from the customer to CIRCL. Weeks on site instead of months keep the customer’s process running — and reduce the period in which a project is exposed to weather, theft and coordination failures. A building designed to be adapted or disassembled is a strategic asset rather than a fixed liability. Factory production depends less on site trades that Belgian construction cannot find. And documented carbon and material performance — CIRCL reports around 49 tonnes of CO₂ saved per house, with roughly 70 percent bio-based and 40 percent recycled content — is what the customer’s bank and the customer’s own reporting now ask for.

Why the argument is harder than it sounds

The difficulty is not that the argument is weak. It is that the tender does not ask for it. A procurement process built around €/m² will compare €/m², and a supplier who answers with a thirty-year total-cost model is answering a question nobody in the room was asked to evaluate. This is the same wall Kaneka meets when a better plastic is compared as one plastic against another: the value is real, and it is outside the frame. What changes the outcome is not a better brochure but a different comparison, agreed before the tender is written — with the developer, the CFO and increasingly the financing bank, each of whom has a reason to care about a different line in the list above. That is demand two in the research, involve everyone, and it is where most of the selling happens in a case like this.

There is a second difficulty, and CIRCL names it too: the perception that prefabricated means lower quality. A proposition that promises certainty has to carry its own evidence — completed projects, delivery records, energy performance in use. Certainty is a claim until it is measured.

The honest qualifier

Our interviews with Wim Pieter and Peter Bertels at CIRCL were about where circular building ends and regenerative building begins; the total-cost argument above is CIRCL’s own public position, not something we measured. We have not seen a thirty-year cost comparison for a completed CIRCL project against a traditional one, and until such comparisons exist the claim that the picture reverses over time is a plausible model, not a finding. CIRCL’s metrics are reduction metrics — less carbon, less waste — which places the company firmly in strong sustainability and circularity; the regenerative step, restoring ecosystems and communities to a net-positive state, is an ambition rather than a practice, as the company itself acknowledges. And a housing system sold on certainty still has to be bought by customers who, for now, are asked by their own procedures to compare on price.

The work

The lesson travels well beyond construction. Every sector has its €/m² — the unit the tender was built around, easy to compare and blind to most of the value. Suppliers who are better on the things the unit cannot see have two options: accept the comparison and lose on it, or change the comparison before it is made. The second option is not a sales technique. It is a piece of work with the customer’s finance function and, increasingly, with the customer’s bank, done early, with numbers the customer will defend as their own.


Is your proposition being compared on the tender’s unit, or on the value it creates? Take the seven-question self-audit. From the Future of Selling research programme, co-led by Prof. dr. Régis Lemmens and Prof. dr. Javier Marcos — see the working paper Engineering Systemic Value in B2B. With thanks to CIRCL and Vanhout.


Discover more from Future of Selling

Subscribe to get the latest posts sent to your email.

Leave a Reply